UNDERGROUND RIVER FORCES FREEZING AT VALENCIA

When construction of the first line of the Valencia metro system began, a sewer perpendicular to the track and then an ancient river even deeper were discovered. Therefore, ground freezing had to be used in order to excavate the underground tunnel. Construction methods and details are described for this, the third metro system to be built in Spain.

  • Availability:
  • Corporate Authors:

    Morgan-Grampian (Construction Press) Limited

    Morgan-Grampian House, 30 Calderwood Street
    London SE18 6QH,   England 
  • Authors:
    • Delgado, C
  • Publication Date: 1989-7

Media Info

  • Features: Figures; Photos;
  • Pagination: p. 38-39
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00486533
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Aug 31 1989 12:00AM