REHABILITATION OF REINFORCED CONCRETE BRIDGE DECKS. FINAL REPORT

This is the fourth, and final, report in a series on reinforced concrete bridge decks resulting from a three-year study conducted for the New Mexico State Highway and Transportation Department (NMSH&TD). This fourth report deals primarily with the deck condition survey and its use in the selection of a bridge deck rehabilitation method. Background materials, contained in the previous three reports, is summarized. This includes information on protective systems to mitigate deck deterioration; the feasibility of a bridge deck management system for use in establishing rehabilitation priorities; and results of a chloride ponding test on concrete core samples from selected NMSH&TD bridge decks to investigate the effectiveness of various protective systems. Conclusions based on the results of the three-year study are presented and two related studies are proposed.

Media Info

  • Features: Figures; References;
  • Pagination: 45 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00488302
  • Record Type: Publication
  • Report/Paper Numbers: FHWA-HPR-NM-83-93
  • Contract Numbers: C00809
  • Files: TRIS, USDOT, STATEDOT
  • Created Date: Sep 30 1989 12:00AM