POLYMER CONCRETE OVERLAYS FOR BRIDGE DECKS. CONSTRUCTION REPORT
This report covers the construction of a 3/8-inch Flexolith overlay on a concrete-filled steel grid bridge deck on SR 0060 in Allegheny County. The application procedure is straightforward with no special equipment needed. However, the contractor's inexperience with the material created application problems on the eastbound deck. Patches were made between coats to level low areas created by non-uniformity of the first two applications. These application problems were eliminated by the westbound deck and no intermediate patches were required.
-
Corporate Authors:
Pennsylvania Department of Transportation
Bureau of Bridge and Roadway Technology, T&S Bldg, Room 1009
Harrisburg, PA United States 17120Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC United States 20590 -
Authors:
- Arellano, J L
- Publication Date: 1988-6
Media Info
- Features: Appendices; Figures; Photos; Tables;
- Pagination: 28 p.
Subject/Index Terms
- TRT Terms: Bridge decks; Construction; Overlays (Pavements); Polymer concrete
- Subject Areas: Bridges and other structures; Construction; Highways; Maintenance and Preservation; Materials; I61: Equipment and Maintenance Methods;
Filing Info
- Accession Number: 00482354
- Record Type: Publication
- Report/Paper Numbers: FHWA-PA-87-030+83-29, Res Proj No. 83-29C
- Contract Numbers: RP 83-29C
- Files: TRIS, USDOT, STATEDOT
- Created Date: Apr 30 1989 12:00AM