OKLAHOMA'S TTV MOVES BARRIER WALL IN ONE PASS
This article describes innovations used in a 4-mile reconstruction project on I-240 in Oklahoma City, Oklahoma, including a new machine that facilitates work zone traffic control. The unique machine moves a specially designed concrete barrier wall at a rate of 2,500 linear feet in 5 to 7 minutes. The new machine, called the transfer and transport vehicle (TTV), laterally transfers the barrier wall one lane over in one pass. The precast barriers are joined at the ends by hinge pins and have specially designed flared tops to allow the machine to pick them up. Two workers are required to operate the unit.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/oclc/11660022
-
Corporate Authors:
Scranton Gillette Communications
380 E Northwest Highway, Suite 200
Des Planes, IL United States 60016-2282 -
Authors:
- Hegg, D
- Publication Date: 1988-9
Media Info
- Pagination: p. 72-73
-
Serial:
- Roads & Bridges
- Volume: 26
- Issue Number: 9
- Publisher: Scranton Gillette Communications
- ISSN: 8750-9229
- Serial URL: http://www.roadsbridges.com/rb/
Subject/Index Terms
- TRT Terms: Concrete; Reconstruction; Traffic barriers; Walls; Work zone traffic control
- Uncontrolled Terms: Barriers
- Subject Areas: Construction; Design; Highways; I50: Construction and Supervision of Construction;
Filing Info
- Accession Number: 00476246
- Record Type: Publication
- Files: TRIS
- Created Date: Sep 30 1988 12:00AM