SIGNS AND SAFETY. TEMPORARY PAVEMENT MARKINGS
Studies are reported that evaluated both temporary day-night visible raised pavement marker adequacy and marking patterns in work zones. The first study was conducted to help find temporary markers that can withstand construction zone traffic. Two systems that met the marker requirements are described, and the results of the visibility and durability tests applied to 6 candidate markers are tabulated. The most desirable features in a day-night construction zone marker are listed. The second study investigated 10 candidate temporary marking treatments, namely, one base treatment consisting of 4-ft stripes with 36-ft gaps, and nine other treatments using variations in stripe length, gap length, and reflective and nonreflective raised pavement markers. Significant points that resulted from the studies are noted.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/oclc/1519687
- Publication Date: 1987-8
Media Info
- Pagination: p. 38
-
Serial:
- Better Roads
- Volume: 57
- Issue Number: 8
- Publisher: James Informational Media, Incorporated
- ISSN: 0006-0208
- Serial URL: http://www.betterroads.com
Subject/Index Terms
- TRT Terms: Equipment; Raised road markings; Road markings; Work zone traffic control
- Uncontrolled Terms: Temporary
- Old TRIS Terms: Raised traffic markings; Traffic marking; Traffic marking equipment
- Subject Areas: Geotechnology; Highways; Materials; Operations and Traffic Management; I73: Traffic Control;
Filing Info
- Accession Number: 00472414
- Record Type: Publication
- Files: TRIS
- Created Date: Aug 31 2000 12:00AM