BRIDGE ALERT: HORICON BRIDGE RESURFACED WITH WATERPROOF MATERIAL

The concrete bridge deck of a bridge in Wisconsin was restored and resurfaced with a new topping made from a 2-component, acrylic-polymer-modified, cement-based material. The high-density waterproof material is designed for resurfacing pitted, spalled, and scaled concrete surfaces. The resurfacing procedure is briefly described.

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00471975
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Jul 31 1987 12:00AM