DEWATERING CHALLENGES FLORIDA CULVERT PROJECT

It is described how a quadruple 12 ft/10 ft box is being replaced with a double 24 ft/10 ft culvert 208 ft long, while maintaining water flow through at least one barrel and six lanes of heavy traffic at all times. The project consists of 8 or 10 separate phases with a substantial amount of sheet piling and diversion of water. The details are described of the dewatering process.

  • Availability:
  • Corporate Authors:

    Scranton Gillette Communications

    380 E Northwest Highway, Suite 200
    Des Planes, IL  United States  60016-2282
  • Authors:
    • Wonum, S
  • Publication Date: 1988-5

Media Info

Subject/Index Terms

  • TRT Terms: Culverts; Dewatering; Sheet piling
  • Subject Areas: Bridges and other structures; Construction; Highways; Hydraulics and Hydrology; I26: Water Run-off - Freeze-thaw;

Filing Info

  • Accession Number: 00469624
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Jul 31 1988 12:00AM