DEWATERING CHALLENGES FLORIDA CULVERT PROJECT
It is described how a quadruple 12 ft/10 ft box is being replaced with a double 24 ft/10 ft culvert 208 ft long, while maintaining water flow through at least one barrel and six lanes of heavy traffic at all times. The project consists of 8 or 10 separate phases with a substantial amount of sheet piling and diversion of water. The details are described of the dewatering process.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/oclc/11660022
-
Corporate Authors:
Scranton Gillette Communications
380 E Northwest Highway, Suite 200
Des Planes, IL United States 60016-2282 -
Authors:
- Wonum, S
- Publication Date: 1988-5
Media Info
- Pagination: p. 82
-
Serial:
- Roads & Bridges
- Volume: 26
- Issue Number: 5
- Publisher: Scranton Gillette Communications
- ISSN: 8750-9229
- Serial URL: http://www.roadsbridges.com/rb/
Subject/Index Terms
- TRT Terms: Culverts; Dewatering; Sheet piling
- Subject Areas: Bridges and other structures; Construction; Highways; Hydraulics and Hydrology; I26: Water Run-off - Freeze-thaw;