BORED PILES (ENGLISH TRANSLATION)

LES PIEUX FORES

The construction, inspection, and testing of bored piles (drilled shafts, drilled piers, caissons) as practiced by government agencies in France are discussed in detail. Some of the topics that are treated in the document are contracts, methods of making the excavation, casings and liners, rebar cages, tests for completed piles, and methods of repair of defective piles. A number of technical notes are included at the end of the work that deal with various types of tools, machines, and construction techniques. Of special interest in the publication is the attention to detail with regard to various construction techniques. The engineers, owners, and contractors in the United States who are involved in the design and construction of drilled shafts will find the book to be of great interest. Construction details turn out to be critical with regard to the success of this type of deep foundation.

  • Record URL:
  • Supplemental Notes:
    • This publication is the English translation of the French publication les Pieux Fores, originally published by le Laboratoire Central des Ponts et Chaussees. The translator is Lymon C. Reese.
  • Corporate Authors:

    University of Texas, Austin

    Geotechnical Engineering Center
    Austin, TX  United States  78712

    Federal Highway Administration

    Turner-Fairbank Highway Research Center, 6300 Georgetown Pike
    McLean, VA  United States  22101
  • Publication Date: 1986-4

Language

  • French

Media Info

  • Media Type: Digital/other
  • Pagination: 385 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00472182
  • Record Type: Publication
  • Source Agency: Federal Highway Administration
  • Report/Paper Numbers: FHWA-TS-86-206
  • Contract Numbers: DTFH61-84-P-10008
  • Files: NTL, TRIS, USDOT
  • Created Date: Jul 31 1988 12:00AM