A VALUE CONCEPT FOR PAVEMENT CONSTRUCTION PAY ADJUSTMENT SCHEDULES

A value concept is presented that can serve as a basis for developing rational payment schedules for pavement construction. Provisions are made for incorporating both the average and standard deviation of material test results into a pay determination scheme that is based on the relative pavement life effects. The concept is based on the recognition that at the time a pavement is considered to have failed, only a small percentage of the surface actually exhibits severe distress. As a result, the life of the pavement is controlled not by the average or fiftieth percentile of the material, but by a lower percentile representative of the actual surface distress.

Media Info

  • Media Type: Print
  • Features: Figures; References;
  • Pagination: pp 45-48
  • Monograph Title: Concrete pavement construction
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00459222
  • Record Type: Publication
  • ISBN: 0309039568
  • Files: TRIS, TRB
  • Created Date: Oct 31 1986 12:00AM