WINDSOR-EAST BERKSHIRE TRAFFIC STUDY 1972/73. PART II AND PART III. TECHNICAL APPENDICES
Part II of this 3-part report contains details of the highway and traffic study. Data are included on traffic flow on various A and B class roads, evaluations of future flows, travel costs and constructional costs, and recommended network assignments. Part III contains details of the land use/environment study. See also IRRD abstract no.211987. /TRRL/
-
Corporate Authors:
Berkshire, County of, England
Kennett House, Kings Road
Reading, England - Publication Date: 0
Language
- English
Media Info
- Features: Figures; Tables;
- Pagination: 72 p.
Subject/Index Terms
- TRT Terms: Construction; Costs; Environment; Forecasting; Land use; Road construction; Traffic assignment; Traffic flow; Traffic surveys; Travel; Travel budgets; Travel costs; Urban areas
- Uncontrolled Terms: Construction costs; Traffic studies
- Geographic Terms: United Kingdom
- ITRD Terms: 224: Cost; 2455: Environment; 132: Forecast; 698: Journey; 356: Land use; 3665: Road construction; 679: Traffic assignment; 671: Traffic flow; 676: Traffic survey; 8119: United Kingdom; 313: Urban area
- Subject Areas: Construction; Finance; Highways; Operations and Traffic Management; Planning and Forecasting; I72: Traffic and Transport Planning;
Filing Info
- Accession Number: 00099722
- Record Type: Publication
- Source Agency: Transport and Road Research Laboratory (TRRL)
- Report/Paper Numbers: R&D Rept.
- Files: ITRD, TRIS
- Created Date: Nov 18 1975 12:00AM