MEASUREMENT OF WIND INDUCED MOTION OF A SUSPENSION BRIDGE. FINAL REPORT

During the months of November and December 1981, the equipment loaned the State of Maine DOT by the FHWA was installed on the Deer Isle Bridge. Data continues to be collected on wind, speed and direction, and bridge motion. An analysis by the FHWA Bridge Structures Group is under way.