DESIGN AND CONSTRUCTION OF LINN COVE VIADUCT. FINAL REPORT
In this documentation of the design and construction of the Linn Cove Viaduct, a discussion of the environmental aspects, design specifications, design procedures, and details are included. The environmental restrictions dictated a design and construction methodology never before used in exactly the same manner. The construction is discussed from foundation microshafts to one-directional cantilever erection. The unique construction supervision team and contractor organization is also included.
-
Corporate Authors:
Figg and Muller Engineers, Incorporated
424 North Calhoun Street
Tallahassee, FL United States 32301Federal Highway Administration
Office of Implementation, HRT-20, 6300 Georgetown Pike
McLean, VA United States 22101 -
Authors:
- Barker, J M
- Hall, K
- Klinedinst, G
- Publication Date: 1985-11
Media Info
- Pagination: 134 p.
Subject/Index Terms
- TRT Terms: Bridge design; Bridge foundations; Bridges; Cantilevers; Constraints; Construction management; Design methods; Environmental protection; Specifications; Structural design; Viaducts
- Old TRIS Terms: Microshafts
- Subject Areas: Bridges and other structures; Construction; Design; Environment; Highways; I24: Design of Bridges and Retaining Walls; I53: Construction of Bridges and Retaining Walls;
Filing Info
- Accession Number: 00461876
- Record Type: Publication
- Source Agency: Federal Highway Administration
- Report/Paper Numbers: FHWA-TS-84-214
- Contract Numbers: DOT-FH-11-9629
- Files: TRIS, USDOT
- Created Date: Jan 31 1987 12:00AM