SELECTION CRITERIA FOR PREPARATIONS TO CONSTRUCTION WORKS INVOLVING CONCRETE PUMP PLACING AND CHUTING MASTS

AUSWAHLKRITERIEN FUER DIE ARTEITSVORBEREITUNG BEIM EINSATZ

Where concrete slurry has to be placed in volume rates of 12 cu m/hr or more, it would as a rule come from concrete mixing plants by truck mixer either with incorporated conveying line or in conjunction with a separate chuting mast. Subject of the article is the pump performance and its correlation with fresh concrete viscosity, the required throughput capacity, and safety aspects, further the impact of organizational and operational sequences on the cost-conscious running of a pump-driven conveying system. The safety aspects are underlined by hints resulting from practical experience.

  • Availability:
  • Corporate Authors:

    Verlag fuer Publizataet

    Auf der heide 20
    300 Isernhagen HB, Hannover,   Germany 
  • Authors:
    • Beitzel, H
  • Publication Date: 1985-3

Language

  • German

Media Info

  • Features: References;
  • Pagination: p. 17-24
  • Serial:
    • Strassen und Tiefhau
    • Volume: 39
    • Issue Number: 3
    • Publisher: Verlag fuer Publizataet
    • ISSN: 0039-2197

Subject/Index Terms

Filing Info

  • Accession Number: 00457996
  • Record Type: Publication
  • Source Agency: Engineering Information, Incorporated
  • Files: TRIS
  • Created Date: Sep 30 1986 12:00AM