DEVELOPMENT OF "BALLAST-MAT"

To realize the commercial operation of 250 km/h on the Shin-Kansen network, the "Ballast-mat" which gives more elasticity to the track on elevated structures or tunnels was developed. The process of the development is here introduced through the construction of the ballast-mat, a field test, vibrogir tests, a follow-up examination and material tests in a laboratory. During the process, it became clear that the ballast-mat greatly contributes to the reduction of the cost for track maintenance, the prevention of the pulverization of ballast and the suppression of noise and vibration.

  • Availability:
  • Corporate Authors:

    Ken-yusha, Incorporated

    1-45-6 Hikari-cho, Kokubunji-shi
    Tokyo,   Japan 
  • Authors:
    • Usami, T
    • Satoh, Y
  • Publication Date: 1974-9

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00080092
  • Record Type: Publication
  • Source Agency: Railway Technical Research Institute
  • Report/Paper Numbers: Quart Rpt.
  • Files: TRIS
  • Created Date: Jan 29 1976 12:00AM