ELECTRIFICATION OF THE ROUTES EHRANG-IGEL AND KARTHAUS-PERL TO THE FRONTIER
ELEKTRIFIZIERUNG DER STRECKEN EHRANG-IGEL-BUNDESGRENZE UND KARTHAUS-PERL-BUNDESGRENZE
After a review of the traffic geography and the construction works over recent years in the Trier area, the traffic flows are discussed. This is followed by a description of the changes in the signalling equipment consequent upon route electrification as well as the works construction aspects. The Author finally deals with the fixed equipment for electric train running and operation.
-
Corporate Authors:
Hestra Verlag
Holzhofallee 33, Postfach 4244
6100 Darmstadt 1, Germany -
Authors:
- BEHMANN, U
- Publication Date: 1974-9
Language
- German
Media Info
- Features: Figures; References;
- Pagination: p. 347-353
-
Serial:
- Eisenbahntechnische Rundschau
- Volume: 23
- Issue Number: 9
- Publisher: Hestra Verlag
Subject/Index Terms
- TRT Terms: Catenaries (Railroads); Electric substations; Planning; Railroad electrification; Traffic signal control systems
- Identifier Terms: Deutsche Bahn; Deutsche Bundesbahn
- Old TRIS Terms: Signal systems
- Subject Areas: Planning and Forecasting; Railroads;
Filing Info
- Accession Number: 00080084
- Record Type: Publication
- Source Agency: Eisenbahntechnische Rundschau
- Files: TRIS
- Created Date: Jan 16 1975 12:00AM