ATTAINING THE DURABILITY OF THE TRACK LEVEL
Non-synchronous constant-tamping techniques to attain the required density of compaction now incorporating sleeper-end tamping to obtain 15-cm penetration laterally towards the zone compacted from the sleeper sides combined with automatic adjustment which sees the last 2-mm of lift pressed up and held despite pressure from below by Plasser & Theurer 07-RS system.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/oclc/9675046
-
Corporate Authors:
Broadfields (Technical Publishers) Limited
Little Leighs
Chelmsford, Essex CMB 1PM, England - Publication Date: 1974-9
Media Info
- Features: Figures; Photos;
- Pagination: p. 332-333
-
Serial:
- Rail Engineering International
- Volume: 4
- Issue Number: 7
- Publisher: De Rooi Publications
- ISSN: 0141-4615
Subject/Index Terms
- TRT Terms: Maintenance of way; Tamping; Track ballast
- Uncontrolled Terms: Ballast
- Old TRIS Terms: Tampers; Track maintenance equipment
- Subject Areas: Geotechnology; Maintenance and Preservation; Railroads;
Filing Info
- Accession Number: 00072556
- Record Type: Publication
- Files: TRIS
- Created Date: Dec 31 1976 12:00AM