FEASIBILITY OF REAL TIME SIMULATION OF AIRPORT/AIRSIDE OPERATIONS
This study is of real time simulation (RTS), or man-in-the-loop simulation. It is a part of a total study which includes the development of the following three classes of tools to estimate airfield performance and to determine means of maximizing the performance: Analytical models, fast time simulation, and real time simulation. The proposed real time simulation will provide an economical technique to evaluate the impact, from a controller's viewpoint, or proposed changes in an airfield, ATC hardware, and/or ATC procedures.
-
Corporate Authors:
Douglas Aircraft Company, Incorporated
3855 Lakewood Boulevard
Long Beach, CA United States 90801Federal Aviation Administration
800 Independence Avenue, SW
Washington, DC United States 20591 -
Authors:
- O'Neill, J B
- White, R T
- Publication Date: 1975-3
Media Info
- Pagination: 41 p.
Subject/Index Terms
- TRT Terms: Air traffic control; Air traffic controllers; Airport capacity; Airport operations; Airports; Configuration management; Daylight; Feasibility analysis; Human factors engineering; Information processing; Management; Management information systems; Mathematical models; Methodology; Night; Planning; Problem solving; Real time control; Real time data processing; Simulation; Traffic delays; Visibility
- Uncontrolled Terms: Airspace capacity; Models
- Old TRIS Terms: Capacity quantity; Management planning and control
- Subject Areas: Administration and Management; Aviation; Operations and Traffic Management; Planning and Forecasting; Safety and Human Factors; Terminals and Facilities;
Filing Info
- Accession Number: 00090395
- Record Type: Publication
- Source Agency: National Technical Information Service
- Report/Paper Numbers: DAC-88277 Summary
- Contract Numbers: DOT-FA72WA-2897
- Files: NTIS, TRIS, USDOT
- Created Date: May 29 1975 12:00AM