Staged Road Construction in Very Weak Subgrade Using Polymeric Geocell

The ongoing development of the energy industry in Canada, especially for pipeline-related structures, demands innovative ways of access construction. Most of these are at remote locations and under difficult geotechnical conditions making access a challenge. A 4.1km long unpaved access road leading to a proposed compressor station in Blainville, Quebec was planned for the construction of the station pad and future access. The road was expected to serve as a material haul road for the 200m x 250m gravel pad, regular compressor station construction loads, and future traffic. Construction of the pad was scheduled to start before the winter of 2020. The proposed road alignment had very soft to soft subgrade conditions with saturated peat. There were problems with limited right of way, a landslide-prone zone, a creek crossing, and overhead power lines. The road geometry was to be designed such that there was enough clearance from the overhead power lines and the slide-prone area and maintain the minimum turning radius required for the long and heavy trucks carrying compressor units. Additionally, there were constraints imposed in permits and other aspects of the project that left a short 6-week window for the construction of the road.

Language

  • English

Media Info

  • Media Type: Digital/other
  • Features: Figures; Photos; References; Tables;
  • Pagination: 18p
  • Monograph Title: Transportation Association of Canada 2022 Conference and Exhibition - Changing Ways for our Changing Climate // Association des transports du Canada 2022 Congrès et Exposition - Approches Adaptées pour un Climat changeant

Subject/Index Terms

Filing Info

  • Accession Number: 01895658
  • Record Type: Publication
  • Source Agency: Transportation Association of Canada (TAC)
  • Files: ITRD, TAC
  • Created Date: Oct 9 2023 9:12AM