STRENGTHENING OF THE SIDE WALLS IN 310 METRES OF DOUBLE-TRACK TUNNEL IN THE MADRID METRO, KEEPING THE SECTION AND WITHOUT INTERRUPTING THE PUBLIC SERVICE
REFUERZOS DE LOS HASTIALES DE 310 METROS DE TUNEL DE DOBLE VIA DEL METROPOLITANO DE MADRID, CONSERVANDO SU SECCION SIN INTERRUPCION DEL SERVICIO PUBLICO
No Abstract.
-
Corporate Authors:
Asociacion de Investigacion del Transporte
Alberto Alcocer 38
Madrid, Spain -
Authors:
- Galvan, J
- Delgado Diaz, J M
- Publication Date: 1984
Language
- Spanish
Media Info
- Features: Photos; Tables;
- Pagination: p. 6-15
-
Serial:
- AIT-Revista
- Issue Number: 59
- Publisher: Asociacion de Investigacion del Transporte
Subject/Index Terms
- TRT Terms: Construction projects; Rapid transit; Structural supports; Subways; Tunnel lining
- Geographic Terms: Madrid (Spain)
- Old TRIS Terms: Tunnel repair
- Subject Areas: Construction; Public Transportation;
Filing Info
- Accession Number: 00399578
- Record Type: Publication
- Source Agency: International Union of Railways
- Files: TRIS
- Created Date: Nov 30 1985 12:00AM