ENGINEERING SOLUTIONS TO GEOLOGICAL PROBLEMS IN THE DESIGN AND CONSTRUCTION OF THE HUMBER BRIDGE

The geology and resultant foundation conditions for the humber bridge are described. On the North side the anchorage and pier are founded on chalk, while on the south side the foundations are on Kimmeridge clay. (Arthor/TRRL)

  • Availability:
  • Supplemental Notes:
    • This paper was presented at the 19th Regional Conference of the Engineering Group of the Geological Society on the Engineering Geology of Tidal Rivers.
  • Corporate Authors:

    GEOLOGICAL SOCIETY

    BURLINGTON HOUSE, PICCADILLY
    LONDON,   United Kingdom  W1V 0JU
  • Authors:
    • Simm, K F
  • Publication Date: 1984

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00395528
  • Record Type: Publication
  • Source Agency: Transport Research Laboratory
  • Files: ITRD, TRIS
  • Created Date: Oct 31 1985 12:00AM