INSTALLATION OR REPLACEMENT OF CULVERTS
This presentation reviews the criteria that must be used when constructing or replacing culverts. Among the topics addressed: design factors, installation, foundations, headwalls, construction costs, open cut installation, installation by boring, jacking, tunneling, threading, true economic cost and life expectancy.
-
Supplemental Notes:
- A paper Presented during the Proceedings of the Eighty-Ninth Annual Conference of the American Railway Bridge & Building Association, Chicago Illinois, September 24-26, 1984.
-
Corporate Authors:
American Railway Bridge & Building Association
18154 Harwood Avenue
Homewood, IL United States 60430 - Conference:
- Publication Date: 1984
Media Info
- Pagination: p. 34-38
Subject/Index Terms
- TRT Terms: Boring; Building; Construction; Costs; Culverts; Design; Facilities; Foundations; Installation; Jacks (Mechanical equipment); Open cut excavation; Retaining walls; Service life; Tunneling
- Uncontrolled Terms: Construction costs; Design criteria; Headwalls; Jacking
- Old TRIS Terms: Foundations (Structures); Open cuts
- Subject Areas: Bridges and other structures; Construction; Design; Finance; Highways; Maintenance and Preservation;
Filing Info
- Accession Number: 00395441
- Record Type: Publication
- Files: TRIS
- Created Date: Nov 30 1996 12:00AM