DRILLING OPERATIONS IN TUNNEL CUTTING

BUSACKI RADOVI PRI IZRADI PREDUSJEKA TUNELA

The frontal and transverse method of drilling for blasting operations in tunnel cuttings and access roads is presented. The arrangement of boreholes and mine place-scheme with regard to the sequence of detonations are also presented. Some experimental data for the determination of drilling depth, distance between boreholes and least resistance are given. It is pointed out that the increased volume of drilling by means of the observed methods can be justified because of increased terrain stability. (TRRL)

  • Supplemental Notes:
    • From the book, "Mehanika Stijena, Temeljenje, Podzemni Radovi", pp 1203-16.
  • Corporate Authors:

    Drustvo Inzenjera i Technicara

    Berislaviceva 6
    Zagreb, Croatia,   Yugoslavia 
  • Authors:
    • Dunda, S
  • Publication Date: 1983

Language

  • Croatian

Media Info

  • Features: Figures; References;
  • Pagination: 14 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00399648
  • Record Type: Publication
  • Source Agency: Transport and Road Research Laboratory (TRRL)
  • Files: ITRD, TRIS
  • Created Date: Nov 30 1985 12:00AM