Automated vehicle traffic control tower 2 : project report
The Automated Vehicle Traffic Control Tower (AVTCT) phase 2 continues the development of the testbed initiated in the pre-study phase. The focus of this phase of the project includes: (i) The architecture of a system with automated vehicles and one or several control towers, including responsibilities and information flows. (ii) Investigating the requirements on cellular connectivity, computational infrastructure, and sensors in the traffic tower environment, in order to guarantee the performance of the AVTCT operation. (iii) Increasing knowledge about human interaction with the system at different levels and for different tasks, by utilizing the testbed for experiments and simulation. (iv) The role of Traffic control tower within the transportation system.
- Record URL:
-
Corporate Authors:
KTH Royal Institute of Technology, Integrated Transport Research Lab
Stockholm, Sweden -
Authors:
- Bin, Elisa
- Jiang, Frank
- Uddin, Jasim
- Islam, Mohammad Manjurul
- Gråsjö, Mikael
- Holmqvist, Johan
- Publication Date: 0
Language
- English
Media Info
- Pagination: 20p
Subject/Index Terms
- TRT Terms: Autonomous vehicles; Highway traffic; Prototypes; Real time data processing; Remote control; Vehicle fleets
- ITRD Terms: 1244: Autonomous vehicle; 1223: Fleet of vehicles; 9109: Prototype; 8679: Real time; 3893: Remote control; 773: Road traffic
- Subject Areas: I91: Vehicle Design and Safety;
Filing Info
- Accession Number: 01878492
- Record Type: Publication
- Source Agency: Swedish National Road and Transport Research Institute (VTI)
- Files: ITRD, VTI
- Created Date: Apr 3 2023 4:46PM