FOUNDATION GROUTING PRACTICES AT CORPS OF ENGINEERS DAMS

This report includes results of review of 23 grouting case histories at 14 Corps of Engineers projects constructed over a 4-decade period. Corps grouting practices, including technical requirements, contractual procedures, and construction management of grouting work are analyzed. Results of the grouting projects are evaluated and costs are analyzed along with legal decisions and trends. The report identifies areas of needed improvements in the Corps grouting programs and makes specific recommendations for achieving those improvements. (Author)

  • Corporate Authors:

    Army Engineer Division, Missouri River

    Omaha, NE  United States  68102

    Army Engineer Division, Southwestern

    Dallas, TX  United States  75242

    George Washington Transportation Research Institute. Center for Intelligent Systems Research

    ,    

    Department of the Army

    Army Corps of Engineers
    Washington, DC  United States  20314

    U.S. Army Waterways Experiment Station

    Geotechnical Laboratory, 3909 Halls Ferry Road
    Vicksburg, MS  United States  39180-6199
  • Authors:
    • Albritton, J
    • Jackson, L
    • Bangert, R
  • Publication Date: 1984-10

Media Info

  • Features: Appendices; Figures; Tables;
  • Pagination: 404 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00395200
  • Record Type: Publication
  • Report/Paper Numbers: Tech Rpt. GL-84-13 Final Rpt.
  • Files: TRIS
  • Created Date: Jun 30 1985 12:00AM