MONITORING OF THE BOWEN BRIDGE FOUNDATIONS
Bowen Bridge is the second road crossing of the Derwent River in Hobart. In addition to superstructure loading the bridge piers have been designed to withstand impact from 5000 tonne barges, this design feature being introduced principally as a result of the Tasman Bridge disaster in January, 1975. The bridge is supported on 13.3m diameter caissons, extending to 47m below river level to found on rock. This paper presents details of site stratigraphy, design and general arrangement of the foundations. Monitoring of two aspects of rock performance during construction is included in the paper; water pressure relief for cofferdam dewatering and rock mass stiffness for comparison with design assumptions. Water pressure relief in the rock at and below foundation level was required to permit construction of the caisson walls in the dry inside cofferdams. Pressure relief holes were drilled in the rock and piezometers installed to monitor pressures during and after dewatering. Rock mass stiffness is a significant parameter in assessing the response of the foundation to superstructure and ship impact loadings. A programme of rock coring and pressuremeter testing provided estimates of rock stiffness for design purposes. These estimates are compared with data from direct reading multi-rod extensometers installed up to 60m below river level. Details of the extensometer installations, together with assessments of rock mass stiffness from pressuremeter and extensometer records are presented (Author/TRRL)
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/isbn/0858252082
-
Supplemental Notes:
- Papers presented during the Geomechanics-Interaction, Fourth Australia-New Zealand conference on Geomechanics, Perth, Western Australia, 14-18 May 1984, Volumes I and II.
-
Corporate Authors:
Institution of Engineers
11 National Circuit
Barton, A.C.T., Australia -
Authors:
- Chandler, B C
- Harvey, R J
- Publication Date: 1984-3
Media Info
- Features: Figures; References; Tables;
- Pagination: p. 427-432
- Monograph Title: GEOMECHANICS - INTERACTION. FOURTH AUSTRALIA - NEW ZEALAND CONFERENCE ON GEOMECHANICS, PERTH, WESTERN AUSTRALIA, 14-18 MAY 1984. PREPRINTS OF PAPERS. VOLUMES I AND II
-
Serial:
- Issue Number: 84/2
Subject/Index Terms
- TRT Terms: Bridge design; Bridge foundations; Bridge piers; Bridge superstructures; Bridges; Caissons; Cofferdams; Conferences; Construction management; Continuous structures; Dewatering; Extensometers; Foundations; Geometric curves; Ground settlement; Impacts; Inland waterways; Instruments for measuring loads or pressure; Monitoring; Performance; Piezometers; Pressiometric probes; Pressure gages; Rocks; Ships; Stiffness; Strain gages; Stratigraphy; Structural design; Surveillance; Water pressure
- Uncontrolled Terms: Pressiometer
- Geographic Terms: Australia
- Old TRIS Terms: Hyperbolas
- ITRD Terms: 8006: Australia; 3455: Bridge; 3434: Bridge pier; 3389: Caisson; 3442: Cofferdam; 8525: Conference; 3666: Construction method; 9006: Continuous; 3377: Foundation; 1088: Inland waterway; 6107: Piezometer; 6128: Pressiometer; 4154: Rock; 5792: Settlement; 5931: Stiffness; 5562: Strain gauge; 3473: Superstructure (bridge); 9101: Surveillance
- Subject Areas: Bridges and other structures; Construction; Design; Geotechnology; Highways; Marine Transportation; Vehicles and Equipment; I24: Design of Bridges and Retaining Walls; I53: Construction of Bridges and Retaining Walls;
Filing Info
- Accession Number: 00392055
- Record Type: Publication
- Source Agency: ARRB
- ISBN: 0-85825-208-2
- Files: ITRD, TRIS, ATRI
- Created Date: Mar 29 1985 12:00AM