NECESSITY OF MEASUREMENTS OF OVERHEAD CONTACT INSTALLATIONS AT THE WEST GERMAN RAILROAD SYSTEM (DB)
MESSUNG DER FAHRDRAHTHOEHENLAGE BEI BAU UND INSTANDHALTUNG
In order to measure the contact wire height at the DB, point concentrated methods are used with optical plumb and with the measuring cross. It is also possible to measure with both methods the horizontal position. A continuous measurement and record is realized by the contact wire gage which is attached to the tower railcar.
-
Corporate Authors:
Verlag R Oldenbourg
Rosenheimer Strasse 145
Munich 80, Germany -
Authors:
- Trinkaus, H
- Publication Date: 1983-11
Language
- German
Media Info
- Pagination: p. 336-340
-
Serial:
- Elektrische Bahnen
- Volume: 81
- Issue Number: 11
- Publisher: Verlag R Oldenbourg
Subject/Index Terms
- TRT Terms: Catenaries (Railroads); Data collection; Electric railroads; Inspection cars; Railroad electrification
- Identifier Terms: Deutsche Bahn; Deutsche Bundesbahn
- Geographic Terms: Germany
- Subject Areas: Maintenance and Preservation; Public Transportation; Railroads;
Filing Info
- Accession Number: 00393532
- Record Type: Publication
- Source Agency: Engineering Index
- Files: TRIS
- Created Date: May 31 1985 12:00AM