REHABILITATION OF THE FREMONT STREET BRIDGE
The author presents the design-construction details that were employed in rehabilitating the Fremont Street Bridge, a 50-year-old old concrete arch structure situated near Pittsburgh, Pennsylvania. Precast decking and a two-piece precast floor beam assembly were among the construction techniques used to repair the bridge while maintaining uninterrupted traffic.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/08879672
-
Corporate Authors:
Prestressed Concrete Institute
20 North Wacker Drive
Chicago, IL United States 60606 -
Authors:
- Smyers, W L
- Publication Date: 1984-9
Media Info
- Pagination: p. 34-51
-
Serial:
- PRECAST/PRESTRESSED CONCRETE INSTITUTE. JOURNAL
- Volume: 29
- Issue Number: 5
- Publisher: Precast/Prestressed Concrete Institute
- ISSN: 0887-9672
Subject/Index Terms
- TRT Terms: Arch bridges; Bridge decks; Concrete; Concrete bridges; Concrete construction; Driver rehabilitation; Highway traffic control; Methodology; Precast concrete; Repairing; Work zone traffic control
- Uncontrolled Terms: Rehabilitation
- Old TRIS Terms: Rehabilitation techniques; Uninterrupted traffic
- Subject Areas: Highways; Maintenance and Preservation; Operations and Traffic Management; I61: Equipment and Maintenance Methods;
Filing Info
- Accession Number: 00393372
- Record Type: Publication
- Source Agency: Engineering Index
- Files: TRIS
- Created Date: May 31 1985 12:00AM