MASS DISTRIBUTION BY BALANCE SHEET FRAMEWORK METHOD IN LINEAR EARTHWORKS
MASSENVERTEILUNG MIT DEM BILANZGERUEST BEI LINIENFOERMIGEN ERDBAUWERKEN
The described method is intended to minimize earthmoving costs in linear earthwork. Accepted as working conditions for this method are a discretionary number of exit tracks from the route and/or lateral earth deposits. The instrument for cost minimization is the balance sheet framework model. It covers earth movements in route direction only. Transverse earth movements are beyond the scope of the balance sheet framework method.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/00392197
-
Corporate Authors:
Verlag fuer Publizataet
Auf der heide 20
300 Isernhagen HB, Hannover, Germany -
Authors:
- Spies, G
- Publication Date: 1983-12
Language
- German
Media Info
- Features: References;
- Pagination: p. 12-26
-
Serial:
- Strassen und Tiefhau
- Volume: 37
- Issue Number: 12
- Publisher: Verlag fuer Publizataet
- ISSN: 0039-2197
Subject/Index Terms
- TRT Terms: Construction; Construction industry; Costs; Earthwork; Excavations; Highways; Linear systems; Motion; Moving industry; Operations research; Planning; Roads; Savings
- Old TRIS Terms: Balance sheet framework method; Highway systems
- Subject Areas: Construction; Finance; Freight Transportation; Geotechnology; Highways; Planning and Forecasting; I51: Earthworks and Soil Drainage;
Filing Info
- Accession Number: 00393348
- Record Type: Publication
- Source Agency: Engineering Index
- Files: TRIS
- Created Date: May 31 1985 12:00AM