CONCRETE PRODUCTION STANDARDS. PART 2

Part 2 of this article covers the factory production aspects of NZS 3104, part 4 (forward control checks, tests for immediate control), and the requirements in the other standard NZS 3108 (volume batching of aggregates, use of all-in aggregate, technical control of operation, less rigorous control checks and testing). For part 1 of the article see TRIS 33316. (TRRL)

  • Availability:
  • Corporate Authors:

    Concrete Publications Limited

    Securities House, 126 the Terrace
    Wellington,   New Zealand 
  • Publication Date: 1984-6

Media Info

  • Features: Photos;
  • Pagination: p. 19-20
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00393317
  • Record Type: Publication
  • Source Agency: Transport Research Laboratory
  • Files: ITRD, TRIS
  • Created Date: Jun 30 1985 12:00AM