CONCRETE PRODUCTION STANDARDS. PART 2
Part 2 of this article covers the factory production aspects of NZS 3104, part 4 (forward control checks, tests for immediate control), and the requirements in the other standard NZS 3108 (volume batching of aggregates, use of all-in aggregate, technical control of operation, less rigorous control checks and testing). For part 1 of the article see TRIS 33316. (TRRL)
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/05490219
-
Corporate Authors:
Concrete Publications Limited
Securities House, 126 the Terrace
Wellington, New Zealand - Publication Date: 1984-6
Media Info
- Features: Photos;
- Pagination: p. 19-20
-
Serial:
- NEW ZEALAND CONCRETE CONSTRUCTION
- Volume: 28
- Publisher: CEMENT & CONCRETE ASSOCIATION OF NEW ZEALAND
- ISSN: 0549-0219
Subject/Index Terms
- TRT Terms: Aggregates; Air entrained concrete; Compliance; Concrete; Equipment; Manufactures; Mix design; Mixing plants; Quality control; Specifications; Standards; Surveillance; Tests
- Uncontrolled Terms: Batching; Quality
- Geographic Terms: New Zealand
- Old TRIS Terms: Concrete products
- ITRD Terms: 4577: Aggregate; 4742: Air entrained concrete; 178: Compliance (specif); 4755: Concrete; 3674: Equipment; 3647: Manufacture; 4714: Mix design; 3648: Mixing plant; 8079: New Zealand; 9063: Quality; 187: Specification (standard); 9101: Surveillance; 6255: Test
- Subject Areas: Geotechnology; Highways; Materials; Planning and Forecasting; I32: Concrete; I72: Traffic and Transport Planning;
Filing Info
- Accession Number: 00393317
- Record Type: Publication
- Source Agency: Transport Research Laboratory
- Files: ITRD, TRIS
- Created Date: Jun 30 1985 12:00AM