PLANNING AND PREPARATION OF EXPERIMENTAL OPERATING ON THE EMSLAND TRANSRAPID TEST SYSTEM

PLANUNG UND VORBEREITUNG DES VERSUCHSBETRIEBES AUF DER TRANSRAPID-VERSUCHSANLAGE EMSLAND (TVE)--AUFGABEN DER VERSUCHS-UND PLANUNGSGESELLSCHAFT FUER MAGNETBAHNSYSTEME (MVP)

Building and operation of the system are governed by the 1976 law on experimental systems. The equipment to be tested includes the vehicle, the propulsion system, the automatic control system, the infrastructure and the operating equipment. The aim of the experimental operating phase is to optimise the different components of the various systems and test the system as a whole. The tests will culminate in a study on the applicability of the magnetic levitation transport system.

  • Corporate Authors:

    Verlag R Oldenbourg

    Rosenheimer Strasse 145
    Munich 80,   Germany 
  • Authors:
    • BREITLING, W
    • Merkel, E
  • Publication Date: 1984-3

Language

  • German

Media Info

  • Features: Photos; References;
  • Pagination: p. 104-108
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00391918
  • Record Type: Publication
  • Source Agency: International Union of Railways
  • Files: TRIS
  • Created Date: Mar 29 1985 12:00AM