OVERLOADING OF STEEL MULTIGIRDER BRIDGES

The overloading of steel multigirder highway bridges may have deleterious effects on the structural integrity of the superstructure. The overloading of steel bridges is closely linked with the fatigue-life determination of the connection details. It is observed that the actual structural response of these bridges is different from the assumptions made in the design. Results obtained from a computer-based anlaytical model and simulation scheme are presented. The method provides a reliable tool to predict the linear-elastic and inelastic response of bridge superstructures up to the collapse load level. The observations from case studies have indicated that (a) interface slip between the girders and the bridge deck can be neglected for any practical overloadings, (b) high stresses due to overloading tend to be more prominent in the vicinity of the details that are prone to fatigue-crack initiation, (c) residual stresses play a nonnegligible role in the inelastic response of primary steel girders, (d) buckling is an important but not a critical phenomenon, and (e) damage initiation due to overloading can initiate in girders or in the deck, depending on the design details. It was also noted that bridges with a high degree of internal and external structural indeterminacy are less prone to damage induced by catastrophic overload.

Media Info

  • Media Type: Print
  • Features: Figures; References;
  • Pagination: pp 84-88
  • Monograph Title: Second bridge engineering conference. volumes 1 and 2
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00390850
  • Record Type: Publication
  • ISBN: 03090036593
  • Files: TRIS, TRB
  • Created Date: Dec 30 1984 12:00AM