HOWARD FRANKLAND BRIDGE TRAFFIC CONTROL SYSTEM. SESSION 9
Howard Frankland Bridge (HFB), one of three links connecting the St. Petersburg/Clearwater (Florida) area with Tampa, is a three mile, four-lane bridge crossing Tampa Bay. Completed in the late 1950's, the bridge was constructed to now obsolete design standards. The bridge is a part of the Interstate system and has an ADT of 56,000. Traffic congestion and accidents have always been a problem on the bridge. The emergency vehicles response time is affected by the length of the bridge and causeway (more than seven miles between interchanges) and the absence of turnaround facilities. Since there are no shoulders on the bridge, disabled vehicles create a problem as they block at least one traffic lane. Multiple vehicle collisions are common as the resultant bottleneck shockwave travels upstream through the heavy, high speed traffic. After years of interim measures, which included the prohibition of changing lanes on the bridge and the installation of push-button activated, flashing "STALLED VEHICE" signs, the Florida DOT developed plans and specifications for a Traffic Control and Surveillance system. A $2.9 million construction contract was awarded to Georgia Electric Company in November 1980 to install the system. The signs, communications equipment, and CCTV equipment were furnished by Winko-Matic Signal Co. JHK & Associates provided the computer, applications software, and systems engineering support during implementation and for the 18 month maintenance period. The system has been operational since June 1982. The system is operated by the Florida Highway Patrol (FHP). Since it was anticipated that FHP personnel would not necessarily be familiar with computers, emphasis was placed on developing software that is user oriented and a system that is essentially unattended except when an incident is in progress. All operations are automatic based on surveillance data. The operator is required only to confirm that an incident has occurred, supply limited information requested by the system (e.g. estimated duration, type of incident, etc.) and authroize implementation of strategies developed by the system. (Author)
-
Supplemental Notes:
- This paper was presented during the Institute of Transportation Engineers 54th Annual Meeting, San Francisco, California, September 23-27, 1984.
-
Corporate Authors:
Institute of Transportation Engineers (ITE)
Washington, DC United States -
Authors:
- GARDNER, C C
- Conference:
- Publication Date: 1984
Media Info
- Features: Figures;
- Pagination: p. 1-5
Subject/Index Terms
- TRT Terms: Disasters and emergency operations; Highway bridges; Information processing; Needs assessment; Police traffic services; Software; State government; Traffic control
- Uncontrolled Terms: Emergency response; User needs
- Old TRIS Terms: Traffic control systems
- Subject Areas: Highways; Operations and Traffic Management; I73: Traffic Control;
Filing Info
- Accession Number: 00390600
- Record Type: Publication
- Files: TRIS
- Created Date: Jun 30 1985 12:00AM