CALIFORNIA'S THIN BONDED PCC OVERLAY
Details of a thin bonded PCC overlay of a 17 year old PCC pavement are presented. The location was on I-80 near Truckee at 6500-7000 ft elevation. Due to the extent of bond failure, the project is considered to have "failed", and was overlaid with AC. Results of the failure investigation to date are also given. (FHWA)
-
Corporate Authors:
California Department of Transportation
Transportation Laboratory
5900 Folsom Boulevard
Sacramento, CA United States 95819Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC United States 20590 -
Authors:
- Neal, B F
- Publication Date: 1983-6
Media Info
- Pagination: n.p.
Subject/Index Terms
- TRT Terms: Bonding; Experimental roads; Failure; Pavement overlays; Portland cement concrete
- Identifier Terms: Interstate Highway System
- Subject Areas: Construction; Design; Highways; Pavements; I22: Design of Pavements, Railways and Guideways; I52: Construction of Pavements and Surfacings;
Filing Info
- Accession Number: 00392212
- Record Type: Publication
- Report/Paper Numbers: FHWA-CA-Tl-83-04 Intrm Rpt.
- Contract Numbers: F81TL03
- Files: TRIS, ATRI, USDOT, STATEDOT
- Created Date: Feb 28 1985 12:00AM