CONSTRUCTION TECHNOLOGY NEEDS AND PRIORITIES
There are myriad needs for improvements, small and large, in construction technology. This study focuses on 17 types of problems, solutions to which would help to reduce the cost of erecting commercial buildings, light-industrial projects, heavy-industrial projects, and power plants. The list was compiled from 128 responses to a questionnaire survey mailed to selected owners, contractors and designers. Items that deserve priority attention in technological efforts were identified through lengthy interviews with 51 craft superintendents and field engineers at 14 major job sites across the U.S. The survey showed considerable differences in the kind and cost of the work involved in the four sectors of construction that were studied. Among the projects surveyed, the average cost ranged from $25 million for a building to $190 million for a heavy industrial facility and $470 million for a power plant. Even so, considering cost, complexity and time required for installation, the study finds that three areas of construction have the highest potential for gains from technological research: piping, electrical work, and installation of mechanical equipment. (Author)
-
Supplemental Notes:
- A Construction Industry Cost Effectiveness Project Report.
-
Corporate Authors:
Business Roundtable
200 Park Avenue
New York, NY United States 10166 - Publication Date: 1982-8
Media Info
- Features: Figures; References; Tables;
- Pagination: 22 p.
Subject/Index Terms
- TRT Terms: Building; Construction industry; Electrical engineering; Facilities; Installation; Machinery; Needs assessment; Pipe; Strategic planning; Technology
- Old TRIS Terms: Mechanical equipment
- Subject Areas: Construction; Highways; Maintenance and Preservation; I50: Construction and Supervision of Construction;
Filing Info
- Accession Number: 00391401
- Record Type: Publication
- Report/Paper Numbers: Report B-3
- Files: TRIS
- Created Date: Feb 28 1985 12:00AM