INTERIM GUIDELINES ON USE OF WET-MIX MACADAM
The basic aim of these interim guidelines is to set out concisely the technical factors involved in the specification, mixing, laying, compaction and quality control of wet-mix macadam, based on the best information currently available. The guidelines supplement the specification for wet-mix macadam in the specification for road works published by the Department of the Environment and outline the factors which must be taken into account to ensure that the requirements of that specification are met. (TRRL)
-
Corporate Authors:
National Institute for Phys Planning & Constr Res
St Martin's House, Waterloo Road
Dublin 4, Ireland - Publication Date: 1983-7
Media Info
- Features: References; Tables;
- Pagination: 22 p.
Subject/Index Terms
- TRT Terms: Compaction; Crushed rock; Guidelines; Macadam; Mix design; Mixtures; Quality control; Recommendations; Seal coats; Specifications; Surveillance; Water
- Uncontrolled Terms: Laying; Quality
- Geographic Terms: Ireland
- ITRD Terms: 3686: Compaction; 4173: Crushed stone; 8049: Ireland; 3623: Laying; 4714: Mix design; 9047: Mixture; 9063: Quality; 177: Specifications; 2984: Surface dressing; 9101: Surveillance; 4355: Water
- Subject Areas: Construction; Highways; Research; I52: Construction of Pavements and Surfacings;
Filing Info
- Accession Number: 00391085
- Record Type: Publication
- Source Agency: An Foras Forbartha Teoranta
- Report/Paper Numbers: RC 261 Monograph
- Files: ITRD, TRIS, ATRI
- Created Date: Mar 29 1985 12:00AM