INSTRUMENTATION DURING THE DOUBLING OF A ROAD TUNNEL IN MARLS

AUSCULTATION PENDANT LE DOUBLEMENT D'UN TUNNEL AUTOROUTIER DANS DES MARNES

During the construction in the marls of the second tube of the Las Planas motorway tunnel, the analysis and control of the behaviour of the existing tube has been performed. The study included interpretation of measurements of displacements to determine the stress distribution in the concrete lining, computer analysis by finite element model, and measurements of displacements during the works. The number of the covering abstract of the congress is TRIS no. 385148. (Author/TRRL)

  • Availability:
  • Supplemental Notes:
    • This paper was presented at the Fifth International Congress on Rock Mechanics, Melbourne, Australia, 1983, Volume 2, Theme C.
  • Corporate Authors:

    AA Balkema

    P.O. Box 1675
    Rotterdam,   Netherlands  BR-3000

    Australasian Institute of Mining and Metallurgy

    204 Lygon Street
    Carlton, Victoria  Australia  3053
  • Authors:
    • Bailly, J C
    • Bouvard, A
    • Colombet, G
    • Laboure, M
    • Panet, M
  • Publication Date: 1983

Language

  • French

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00385197
  • Record Type: Publication
  • Source Agency: ARRB
  • ISBN: 90 6191 237 7
  • Report/Paper Numbers: BOOK
  • Files: ITRD, TRIS, ATRI
  • Created Date: Jun 28 1984 12:00AM