REPLACEMENT OF THREE ROAD BRIDGES IN DUSSELDORF
ERSATZ VON DREI STRASSENBRUECKEN IN DUESSELDORF OHNE VERKEHRSEINSCHRAENKUNG
Description of how three bridges over a busy railway line were replaced without road or rail traffic restrictions. Description of methods used (lengthwise and lateral displacement, construction) and special applications such as the installation of three partial bridges with rigid supports, displaced lengthwise in succession by means of a cable-suspended bearing structure.
-
Corporate Authors:
Springer Verlag
Heidelberger Platz 3
Berlin, Germany 14197 -
Authors:
- Bayer, E
- Gottstein, F von
- Publication Date: 1984
Language
- German
Media Info
- Features: Photos; References;
- Pagination: p. 27-37
-
Serial:
- Bauingenieur
- Volume: 59
- Issue Number: 1
- Publisher: Springer Verlag
Subject/Index Terms
- TRT Terms: Bridges; Equipment replacement; Overpasses; Reconstruction; Technology
- Uncontrolled Terms: Replacement
- Geographic Terms: Germany
- Subject Areas: Bridges and other structures; Construction; Design; Highways; Maintenance and Preservation; Public Transportation; I24: Design of Bridges and Retaining Walls;
Filing Info
- Accession Number: 00387883
- Record Type: Publication
- Source Agency: International Union of Railways
- Files: TRIS
- Created Date: Sep 28 1984 12:00AM