URBAN RAPID TRANSIT SYSTEM RHEIN (RHINE)-RUHR, WEST GERMANY. INSTALLATION OF ELECTRIC EQUIPMENT FOR PUTTING INTO OPERATION THE LINE SEGMENT BOCHUM MAIN STATION-DORTMUND MAIN STATION
S-BAHN RHEIN-RUHR. BAUMASSNAHMEN AN ELEKTROTECHNISCHEN ANLAGEN ZUR INBETRIEBNAHME DES STRECKENABSCHNITTS BOCHUM HBF - DORTMUND HBF
In September 1983 the S-Bahn traffic has been inaugurated on the line s 1 with a length of 22 km between Bochum main station and Dortmund main station. Due to reconstructions extensive work at the electric installations had to be carried through. A description is given of the electric installations like switching stations, substations, overhead contact system and points heating. The 50-Hz-installations comprise the power supply including emergency power plants and lighting. Further work will follow due to the extension of the lines s 2 and s 4 untile autumn 1987.
-
Corporate Authors:
Verlag R Oldenbourg
Rosenheimer Strasse 145
Munich 80, Germany -
Authors:
- Sieverling, H
- Publication Date: 1983-9
Language
- German
Media Info
- Features: References;
- Pagination: 4 p.
-
Serial:
- Elektrische Bahnen
- Volume: 81
- Issue Number: 9
- Publisher: Verlag R Oldenbourg
Subject/Index Terms
- TRT Terms: Catenaries (Railroads); Electric power supply; Electric substations; Heating (Structures); Rail line extensions; Railroad electrification; Railroad switches; Rapid transit
- Geographic Terms: Germany
- Old TRIS Terms: Switch heaters
- Subject Areas: Energy; Public Transportation; Railroads; Vehicles and Equipment;
Filing Info
- Accession Number: 00386980
- Record Type: Publication
- Source Agency: Engineering Index
- Files: TRIS
- Created Date: Aug 30 1984 12:00AM