SHIELD IN DRIVE TO RENOVATE 180 YEAR OLD CANAL TUNNEL
Tunneling along a tunnel is the method being used to rehabilitate the center of one of Britain's oldest tunnels. Deteriorating brick linings are being replaced with specially designed concrete segments. The method involves erecting a shield in a hand enlarged chamber 7. 6 m diameter X 8 m long, one third of the way into the tunnel, and driving along the profile removing the brick lining with an excavator mounted in the shield, erecting the new concrete segmental lining behind. To ensure safety and to secure the existing tunnel in front of the shield, a steel skid-mounted A-frame is pushed along and used to erect and remove a series of seven steel colliery-type arches supported on hydraulic props.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/0041414X
-
Corporate Authors:
Morgan-Grampian Limited
30 Calderwood Street
London SE18 6QH, England -
Authors:
- Martin, David
- Publication Date: 1983-11
Media Info
- Pagination: p. 35-38
-
Serial:
- Tunnels & Tunnelling International
- Volume: 15
- Issue Number: 11
- Publisher: Progressive Media Markets, Ltd
- ISSN: 0041-414X
Subject/Index Terms
- TRT Terms: Brick construction; Canals; Construction; Precast concrete; Repairing; Structural supports; Tunnel lining; Tunneling
- Uncontrolled Terms: Repairs
- Old TRIS Terms: Navigable tunnels; Tunnels and tunneling
- Subject Areas: Bridges and other structures; Construction; Marine Transportation; Public Transportation;
Filing Info
- Accession Number: 00386317
- Record Type: Publication
- Source Agency: Engineering Index
- Files: TRIS
- Created Date: Jun 28 1984 12:00AM