EFFECT OF HOT CLIMATE ON SLUMP LOSS AND SETTING TIMES FOR SUPERPLASTICIZED CONCRETES

The results of a laboratory investigation of slump loss, setting times, and workability at low and high concrete temperatures for superplasticized concretes are presented. There was a substantial reduction in the intial and final setting times when there was a 16 deg F increase in the initial concrete temperature. Results of the slump-loss study indicated that there was adequate working time (2 to 3.5 hr) when a superplasticizer was used for concretes made at a temperature of 70 deg F (21.2 deg C). For the same concretes mixed at a temperature of 86 deg F (30 deg C), however, there was a considerable reduction in slump and available working time. (Author)

Media Info

  • Media Type: Print
  • Features: Figures; References; Tables;
  • Pagination: pp 33-42
  • Monograph Title: Concrete overlays and inlays, effects of high temperature on concrete, and statistical techniques in construction
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00385235
  • Record Type: Publication
  • ISBN: 0309036135
  • Files: TRIS, TRB
  • Created Date: May 30 1984 12:00AM