TUNNEL DESIGN CONSIDERATIONS FOR THE NEW GERMAN HIGH-SPEED RAILWAY
The ambitious modernization program of West German Federal Railways (DB) has made notable progress despite the worldwide economic recession. compelling reasons have been advanced for placing 62% of the new route in tunnels or cuttings. One of the 17 tunnels in the current construction program is the 2333m long Altengronauer Forst Tunnel, involving cooperation between Austrian and West German companies. Subjects covered include tunneling methods, rock quality considerations, ground support, tunnel lining, and others.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/0041414X
-
Corporate Authors:
Morgan-Grampian Limited
30 Calderwood Street
London SE18 6QH, England -
Authors:
- Braun, W M
- Publication Date: 1983-9
Media Info
- Pagination: p. 37-38
-
Serial:
- Tunnels & Tunnelling International
- Volume: 15
- Issue Number: 9
- Publisher: Progressive Media Markets, Ltd
- ISSN: 0041-414X
Subject/Index Terms
- TRT Terms: Concrete; Concrete bridges; Concrete construction; Correlation analysis; Durability; Excavation and tunneling; Ground handling; Rocks; Tunnel lining; Tunneling
- Identifier Terms: Deutsche Bahn; Deutsche Bundesbahn
- Old TRIS Terms: Decks; Ground support; Rock tunneling
- Subject Areas: Aviation; Bridges and other structures; Construction; Data and Information Technology; Design; Geotechnology; Highways; Materials; Public Transportation; I24: Design of Bridges and Retaining Walls; I33: Other Materials used in Pavement Layers;
Filing Info
- Accession Number: 00384577
- Record Type: Publication
- Source Agency: Engineering Index
- Files: TRIS
- Created Date: Apr 30 1984 12:00AM