KEEPING THE TRAFFIC MOVING
Over the past few years there has been increasing emphasis on reconstruction of the nation's motorways and major trunk roads, as a result of traffic growth and greater axle loadings. With long queues and delays caused by carriageway closures, effective management of traffic flows during maintenance was seen to be of great importance, and the design of traffic management systems for major motorways has gradually been refined, to maximise capacity and reduce safety hazards. However, severe congestion still occurs, particularly at the more difficult sites where there is inadequate capacity and poor alternative routes; the public image of highway maintenance is still at rock bottom. In many ways, the difficult schemes are not the major motorways, but dual 2 lane motorways and heavily trafficked trunk roads, where there is often inadequate carriageway width available to maintain existing traffic flows during reconstruction. Under these circumstances, the traffic management schemes can become very complex, involving many separate stages and perhaps the construction of additional sections of carriageway in order to retain movements at junctions. Based upon the experience of such reconstruction schemes on M2, M20 and a2 the authors will detail the approaches adopted in kent to keep the traffic moving. They will draw conclusions on the cost, and effectiveness of such complex traffic management systems, and will comment on the standards of signing, coning and markings used. (Author/TRRL)
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/isbn/0860501124
-
Supplemental Notes:
- This paper was presented at Seminar K, Traffic Operation and Management, held at the PTRC 11th Annual Summer Meeting, University of Sussex, England, 4-7 July, 1983.
-
Corporate Authors:
PTRC Education and Research Services Limited
110 Strand
London WC2, England -
Authors:
- Harrison, I
- Parker, B
- Conference:
- Publication Date: 1983
Media Info
- Features: Figures;
- Pagination: p. 121-134
Subject/Index Terms
- TRT Terms: Arterial highways; Benefit cost analysis; Conferences; Construction sites; Detours; Freeways; Highway capacity; Highway maintenance; Highway traffic control; Maintenance; Mileposts; Road markings; Traffic congestion; Traffic control; Traffic flow; Traffic lanes; Traffic signs; Width; Work zone traffic control
- Uncontrolled Terms: Two; Use
- Geographic Terms: United Kingdom
- Old TRIS Terms: Strategy
- ITRD Terms: 643: Capacity (road, footway); 562: Carriageway marking; 8525: Conference; 632: Congestion (traffic); 3628: Construction site; 226: Cost benefit analysis; 2748: Main road; 3847: Maintenance; 594: Marker post; 2752: Motorway; 654: Traffic control; 671: Traffic flow; 2827: Traffic lane; 553: Traffic sign; 9082: Two; 8119: United Kingdom; 9084: Use; 6479: Width
- Subject Areas: Highways; Maintenance and Preservation; Operations and Traffic Management; Planning and Forecasting; I72: Traffic and Transport Planning; I73: Traffic Control;
Filing Info
- Accession Number: 00382693
- Record Type: Publication
- Source Agency: Transport Research Laboratory
- ISBN: 0-86050-112-4
- Report/Paper Numbers: Volume P240
- Files: ITRD, TRIS
- Created Date: Apr 30 1984 12:00AM