AN ELECTRONIC SIGNAL BOX ON THE DB
ELEKTRONISCHES STELLWERK DER DEUTSCHEN BUNDESBAHN
Experimental electronic signal boxes are to undergo a series of intensive tests for two years, from 1985, with particular emphasis on maintenance and diagnostic facilities, minimisation of spare-part stocks and staff training. Safety component 1 (SEB 1), which is the basic design unit for the different versions of the system, derives from a solution applied to the hardware. At a latter date, the possibility of designing component SEB 2, according to the principle of comparison by software, will be examined.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/00374997
-
Corporate Authors:
Tetzlaff Verlag GmbH
Havelstrosse 9, Postfach 4006
D-6100 Darmstadt 1, Germany -
Authors:
- WEHNER, L
- Publication Date: 1983-6
Language
- German
Media Info
- Features: Photos; References;
- Pagination: p. 104-107
-
Serial:
- Signal und Draht
- Volume: 75
- Issue Number: 6
- Publisher: Tetzlaff Verlag GmbH
- ISSN: 0037-4997
Subject/Index Terms
- TRT Terms: Diagnostic tests; Electronics; Maintenance practices; Safety; Signaling; Training
- Uncontrolled Terms: Diagnostics
- Old TRIS Terms: Interlocking
- Subject Areas: Education and Training; Maintenance and Preservation; Operations and Traffic Management; Public Transportation; Safety and Human Factors;
Filing Info
- Accession Number: 00381519
- Record Type: Publication
- Source Agency: International Union of Railways
- Files: TRIS
- Created Date: Mar 30 1984 12:00AM