REPAIR AND REHABILITATION - CONVERTING A BRIDGE CRISIS INTO A BRIDGE OPPORTUNITY
The paper deals with the repair and rehabilitation of historic Westinghouse Bridge by vertical deck supports and presents recommendations for bridge concrete maintenance.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/05490219
-
Corporate Authors:
Concrete Construction Publications, Incorporated
P.O. Box 321
Addison, IL United States 60101 - Publication Date: 1983-8
Media Info
- Pagination: p. 598
-
Serial:
- CONCRETE CONSTRUCTION
- Volume: 28
- Issue Number: 8
- Publisher: CEMENT & CONCRETE ASSOCIATION OF NEW ZEALAND
- ISSN: 0549-0219
Subject/Index Terms
- TRT Terms: Alignment; Bridge decks; Bridge superstructures; Bridges; Concrete bridges; Concrete construction; Driver rehabilitation; Repairing; Structural supports
- Uncontrolled Terms: Rehabilitation; Repairs; Vertical alignment
- Old TRIS Terms: Supports
- Subject Areas: Bridges and other structures; Design; Highways; Maintenance and Preservation; I24: Design of Bridges and Retaining Walls; I61: Equipment and Maintenance Methods;
Filing Info
- Accession Number: 00381269
- Record Type: Publication
- Source Agency: Engineering Index
- Files: TRIS
- Created Date: Mar 30 1984 12:00AM