THE BRIDGE DECKS ON THE CARNIA - TARVISIO

GLI IMPALCATI DELLA CARNIA - TARVISIO

This article describes and illustrates the method of deck construction on the viaducts of the Carnia-Tarvis motorway section. The choice of a closed box section solution in the form of prestressed reinforced concrete caisson beams or prefrabricated box sections was based on the following reasons: less structural weight and thus less weight transmitted to the foundations; less deformation because of greater flexural and torsional rigidity; less fatigue stress of materials; aesthetically pleasing aspect; lends itself to modern industrial prefrabrication criteria with a consequent reduction in construction time. Launching and assembly techniques are briefly described and illustrated. (TRRL)

  • Corporate Authors:

    Societa Autostrade

    Via Antonio Nibby 10
    00161 Rome,   Italy 
  • Authors:
    • Banchetti, P
  • Publication Date: 1983-6

Language

  • Italian

Media Info

  • Features: Figures; Photos;
  • Pagination: p. 28-33
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00381147
  • Record Type: Publication
  • Source Agency: Transport Research Laboratory
  • Files: ITRD, TRIS
  • Created Date: Mar 30 1984 12:00AM