A590 MEATHOP TO SAMPOOL BRIDGE IMPROVEMENT. ENGINEER'S REPORT ON CONSTRUCTION

The project reported comprised the construction of: approximately 1km of dualling to existing trunk road; 2.8km of new dual two lane carriageway trunk road; and 2.6km of new single two lane trunk road. Engineering structures included: a double and a triple box culvert, three single box farm underpasses; a farm occupation bridge; and a retaining wall. Details are given of earthworks, drainage, materials and testing. (TRRL)