WEATHERVANE TANKER BARGE MOORING BUOY
Single Buoy Moorings Inc. will install a 70,000 dwt barge single-buoy storage and loading facility for the Societe Nationale des Petroles d'Aquitaine's offshore Ashtart oilfield in the Gulf of Gabes, Tunisia. The nevel stiff mooring arm construction carrying the oil piping is rigidly connected to the buoy turntable and hinged on the barge bow; this enables the barge to "weathervane" around the buoy and obviates floating-hose problems. The barge will receive 30,000 dwt tankers alongside. Terminal Installations Inc. will carry out the installation work.
-
Corporate Authors:
IPC Industrial Press Limited
33-40 Bowling Green Lane
London EC1R 0NE, England - Publication Date: 1972-8
Media Info
- Pagination: p. 82
-
Serial:
- Petroleum Times
- Volume: 76
- Issue Number: 1943
- Publisher: IPC Industrial Press Limited
Subject/Index Terms
- TRT Terms: Floating docks; Floating structures; Offshore terminals; Petroleum; Petroleum terminals; Single point moorings
- Old TRIS Terms: Spm buoy storage
- Subject Areas: Bridges and other structures; Geotechnology; Marine Transportation; Terminals and Facilities;
Filing Info
- Accession Number: 00056566
- Record Type: Publication
- Source Agency: American Petroleum Institute
- Files: TRIS
- Created Date: Jul 22 1974 12:00AM