THE TRANSIT SERVICE EVALUATION SYSTEM OF TTDC

This report assesses maintenance indicators, system safety and system reliability. The four evaluation criteria of: B(best that can be expected with the existing conditions); E(easy-existing conditions are optimal for adherence to schedules); D(dragging, too much time allowed on schedules); and F(fast-reckless driving, not enough time on schedules) were applied. In addition, data were obtained for: boarding and alighting counts, route profiles, transfer analysis, supervisor/operator checks, demographic/geographic observations, financial data, and public requests/suggestions/complaints. Performance indicators to determine cost, ridership and operating data included: total annual cost per employer; total cost per bus hour; total cost per bus divided by total; total cost per passenger; revenues per passenger; deficit by passenger; ratio of in-service hours to pay hours; revenue per bus mile; and operating ratio. Reporting, alterations of routes, variables, measures and standard of performance are examined in detail.

  • Corporate Authors:

    Tidewater Transportation District Commission

    509 East 18th Street
    Norfolk, VA  United States  23504
  • Publication Date: 1979-3-21

Media Info

  • Pagination: n.p.

Subject/Index Terms

Filing Info

  • Accession Number: 00376972
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Aug 30 1983 12:00AM