1979 HIGHWAY CONDITION AND QUALITY OF HIGHWAY CONSTRUCTION SURVEY REPORT FLEXIBLE PAVEMENTS
The 1979 survey was divided into condition, construction quality, and construction staffing phases. The project selection for the condition phase of the review was limited to only those projects that had been reviewed as a part of the construction quality and staffing phase of the 1976 survey. The construction quality phase of the survey consisted of a review and evaluation of selected Interstate and Federal-aid primary projects that were actively engaged in flexible paving operations. The construction staffing phase of the survey was conducted concurrently with the construction quality phase and was designed to provide staffing data for the period of construction represented by the construction quality phase. The 1979 survey was limited in scope to a review of flexible pavement projects only. Subsequent surveys will be conducted on rigid pavements and bridge decks. (Author)
-
Corporate Authors:
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC United States 20590 - Publication Date: 1980-10
Media Info
- Features: Appendices; Figures; Tables;
- Pagination: 97 p.
Subject/Index Terms
- TRT Terms: Bridge decks; Construction; Evaluation; Failure; Federal aid highways; Flexible pavements; Pavements; Quality control; Road construction; Surveys
- Identifier Terms: Interstate Highway System
- Uncontrolled Terms: Pavement conditions; Quality
- Old TRIS Terms: Construction problems
- Subject Areas: Construction; Highways; Pavements; I50: Construction and Supervision of Construction;
Filing Info
- Accession Number: 00377334
- Record Type: Publication
- Files: TRIS, USDOT
- Created Date: Oct 30 1983 12:00AM