PROCEDURES AND GUIDELINES FOR REHABILITATION OF EXISTING FREEWAY-ARTERIAL HIGHWAY INTERCHANGES. VOLUME III-EVALUATION OF INTERCHANGE REHABILITATION PROJECTS
This volume presents evaluations of the traffic operational and safety effectiveness of 40 recent interchange rehabilitation projects. All of the projects involved geometric design modifications at freeway-arterial interchanges in urban and suburban areas. The evaluations, presented in case study form, describe the geometrics of each interchange, the traffic operational safety problems that existed before the improvement, the interchange rehabilitation alternatives considered (including the one finally selected) and the operational and safety effectiveness of the rehabilitation project. The introductory portions of the volume describe the selection of the interchange rehabilitation projects and the procedures used for traffic operational and safety analyses. This volume is the third in a series. The other volumes in the series are: Volume 1-FHWA/RD-81/103 Executive Summary; Volume 2-FHWA/RD-81/104 Design Procedures; and Volume 4-FHWA/RD-81/106 Research Report. (FHWA)
-
Corporate Authors:
Midwest Research Institute
425 Volker Boulevard
Kansas City, MO United States 64110-2299Federal Highway Administration
Office of Research, Environmental Design and Control, 1200 New Jersey Avenue, SE
Washington, DC United States 20590 -
Authors:
- Harwood, D W
- Graham, Jerry L
- Publication Date: 1982-5
Media Info
- Pagination: 365 p.
Subject/Index Terms
- TRT Terms: Arterial highways; Case studies; Driver rehabilitation; Freeways; Highway design; Highway operations; Improvements; Interchanges; Interchanges and intersections; Traffic; Traffic safety
- Uncontrolled Terms: Rehabilitation
- Subject Areas: Design; Highways; Operations and Traffic Management; Planning and Forecasting; Safety and Human Factors; I21: Planning of Transport Infrastructure; I73: Traffic Control;
Filing Info
- Accession Number: 00377239
- Record Type: Publication
- Report/Paper Numbers: FHWA-RD-81-105 Final Rpt., FCP 31J4-032
- Contract Numbers: DOT-FH-11-9318
- Files: TRIS, USDOT
- Created Date: Aug 30 1983 12:00AM